• -15%
R3831 - BR, Thompson Class A2/2, 4-6-2, 60505 'Thane of Fife' - Era 5
search
  • R3831 - BR, Thompson Class A2/2, 4-6-2, 60505 'Thane of Fife' - Era 5
4mm OO Gauge
Hornby

R3831 - BR, Thompson Class A2/2, 4-6-2, 60505 'Thane of Fife' - Era 5

£208.99
£177.64 Save 15%
VAT included We will email you to confirm delivery of out of stock items

BR, Thompson Class A2/2, 4-6-2, 60505 'Thane of Fife' - Era 5

Quantity
Please contact us to check availability

60505 Thane of Fife spent eighty-five days in Doncaster Works being rebuilt as a Class A2/2, the heavy overhaul taking place between 26 October 1942 and 18 January 1943 and the Diagram 118 boiler was fitted during a general overhaul at Doncaster between 29 January and 7 March 1952. 60505 Thane of Fife was allocated to Peterborough’s New England shed at this time, home to the ‘Lodge Link’ crews and as a result, Thane of Fife tended to work longer distance freight and passenger diagrams to Newcastle, as well as working turns to York and Kings Cross.
R3831